
Overview of An Duong District today. Photo: Nguyen Hong Phong
(Haiphong.gov.vn) – The decision on investment policy of the project of renovation, upgrading and expansion of Mang Nuoc road (from the intersection of Ton Duc Thang street – National Highway 5 to provincial road 351) has just been officially approved in Hanoi. The 16th session of the City Council, term XV, term 2016 – 2021.
The project of renovating, upgrading and expanding Mang Nuoc road (from the intersection of Ton Duc Thang street – National Highway 5 to provincial road 351) belongs to Group B project, grade III traffic works, led by An Duong District People’s Committee. private.
The project has the scale, renovating, upgrading and expanding the Mang Nuoc road with a length of 4.3km; width of roadbed Bn=21m (renovation, upgrading and expansion on both sides); Design speed is 50km/h. Total project investment is nearly 379 billion VND from the city budget; Implementation period: 2020-2023.
The objective of the project is to contribute to completing the transport infrastructure in line with the city’s general development plan, contributing to promoting socio-economic development in the region in a stable and sustainable manner, ensuring ensure convenient and safe transportation conditions, promote investment attraction in the key high-tech area to the west of the city with the development space being a high-tech industrial park in An Duong district such as: Trang Due, Nomura, An Duong, An Hung – Dai Ban. At the same time, connecting with the investment project to build a road connecting the intersection of Nam Binh bridge to the intersection of Ton Duc Thang street – Mang Nuoc street after this project is completed.
The Mang Nuoc route (section from the intersection of Ton Duc Thang street – National Highway 5 to provincial road 351) is the main gateway connecting the center of An Duong district to the city center and the main traffic routes. However, at present, many sections of the route have been damaged, degraded, often flooded when it rains heavily, the road surface is narrow, and the traffic volume is large… so there are many potential dangers. loss of traffic safety. The investment in construction, renovation, upgrading and expansion of the route will meet the traffic demand between An Duong district and the city center, in accordance with Resolution No. 45 of the Politburo on construction and transportation. to develop Hai Phong city by 2030, with a vision to 2045.
Source: Minh Hao (haiphong.gov.vn) An Duong district overview today. Photo: Nguyen Hong Phong
(Haiphong.gov.vn) – The decision on investment policy of the project of renovation, upgrading and expansion of Mang Nuoc road (from the intersection of Ton Duc Thang street – National Highway 5 to provincial road 351) has just been officially approved in Hanoi. The 16th session of the City Council, term XV, term 2016 – 2021.
The project of renovating, upgrading and expanding Mang Nuoc road (from the intersection of Ton Duc Thang street – National Highway 5 to provincial road 351) belongs to Group B project, grade III traffic works, led by An Duong District People’s Committee. private.
The project has the scale, renovating, upgrading and expanding the Mang Nuoc road with a length of 4.3km; width of roadbed Bn=21m (renovation, upgrading and expansion on both sides); Design speed is 50km/h. Total project investment is nearly 379 billion VND from the city budget; Implementation period: 2020-2023.
The objective of the project is to contribute to completing the transport infrastructure in line with the city’s general development plan, contributing to promoting socio-economic development in the region in a stable and sustainable manner, ensuring ensure convenient and safe transportation conditions, promote investment attraction in the key high-tech area to the west of the city with the development space being a high-tech industrial park in An Duong district such as: Trang Due, Nomura, An Duong, An Hung – Dai Ban. At the same time, connecting with the investment project to build a road connecting the intersection of Nam Binh bridge to the intersection of Ton Duc Thang street – Mang Nuoc street after this project is completed.
The Mang Nuoc route (section from the intersection of Ton Duc Thang street – National Highway 5 to provincial road 351) is the main gateway connecting the center of An Duong district to the city center and the main traffic routes. However, at present, many sections of the route have been damaged, degraded, often flooded when it rains heavily, the road surface is narrow, and the traffic volume is large… so there are many potential dangers. loss of traffic safety. The investment in construction, renovation, upgrading and expansion of the route will meet the traffic demand between An Duong district and the city center, in accordance with Resolution No. 45 of the Politburo on construction and transportation. to develop Hai Phong city by 2030, with a vision to 2045.
Source: Minh Hao (haiphong.gov.vn)