1. Project Transport works
2. Terms of value 13.299.977.132 VNĐ
3. Scale Survey, design, construction and return of local roads from Truong Son beach to the intersection Km 84+00; Dig the old roadbed to compensate for the buckling of crushed stone, water the asphalt to adhere to, the old asphalt pavement is used with fine-grained asphalt,   the old asphalt pavement is used with 3.5cm thick asphalt, TC plastic 4.5 kg/m2 ; making new sidewalks and ditches, returning sidewalks, drainage system by sewer D300, trench B300, making traffic signs, supplementing the route Phan Dang saves from Cong Doi junction (Explain: Km1+938.66m ) to Kien An 5 intersection (explain: Km3+204.43m), length 1,265.77m; the road surface structure includes removing the old pavement layer, compacting it, and watering it with permeable asphalt, compensating for warping of fine-grained asphalt with average thickness of 2cm, and 4cm-thick asphalt concrete mat; redo the underground drainage system for people’s living
4. About the complexity and construction conditions Construction in difficult conditions both to ensure traffic and organize construction,
5. Các đặc tính khác Other characteristics
Chủ đầu tư:
Vietnam Infrastructure Development and Financial Investment Corporation (Vidifi)
Address
from Truong Son beach to the intersection KM84+00 Hai Phong city
Giai đoạn thực hiện:
Từ tháng 16/2/2016 - 30/4/2016
Nhà thầu chính:
Tên nhà thầu:
CONSTRUCTION AND MECHANIC JSC
Giá trị hợp đồng:
13 bilion