HTM Kovie Hotel Construction Investment Project
CONSTRUCTION AND MECHANIC JSC
| 1. Project | Civil Construction Project Grade II |
| 2. Total Investment | 120.450.869.000 VND |
| 3. Scale | Building a building with 1 basement and 15 floors; building height 56m, 4-star hotel. Construction area 595m2; Floor area 6,090m2; The basement is a garage, electrical and water technical rooms; The first floor has a waiting room, a staff room; 2nd floor kitchen; 3rd floor large meeting room and dining office; From the 4th to the 13th floor, 106 rooms are arranged; On the 14th floor, there is a service room with a gym, sauna, and massage room; 15th floor is swimming pool, entertainment; 2 stairs and elevator; foundation design is bored pile with D = 1.0m, depth of 51.7m from natural height from high to low, placed in layers of coarse medium grain with pile load capacity of 730 tons, piles are linked together by radio the foundation is 2.2m and 2.7m high, concrete grade 400, concrete the basement wall is reinforced concrete grade 400, thickness 220, 2.8m high; Body structure beam frame concrete floor grade 400, wall built using bricks of grade 75 with cement mortar of grade 75; installation of electrical systems: lighting, ventilation fans, MCCB aptomat, powder coated electrical cabinets, installation of lines in protective pipes; installation of water supply and drainage system: Air conditioning and ventilation system; supply pipe using PPR pipe, drain pipe using PVC, synchronous modern sanitary equipment, stainless steel water tank, booster pump; Elevator system, fire protection system; electric light system; wastewater treatment system; transformers, backup generators; synchronous interior equipment; |
| 4. About the complexity and construction conditions | Construction in difficult conditions in terms of ground because it is close to adjacent adjacent houses, technical solutions of appropriate design documents, reasonable construction methods. |
| 5. Other characteristics | According to common usage. |