| 3. Scale |
Building a system of 2-storey office buildings and factories adjacent to the factory, ancillary works including: 2,583 m2 factory, 14.5m high rafter, adjacent 1,018m2 2-storey office building. with reinforced concrete pile foundation structure, reinforced concrete bearing column frame, shaped steel column and truss factory with 2 2 ton girder crane systems, aperture 20.7m, lifting height 5m (using main equipment hoist and HITACHI side beam motor), electrodynamic system, air-conditioning system; building substation house, internal road yard, garage, fire door water tank No. 1 (V=400m3), tank No.2 (V=100m3), outdoor lighting system, gates, fences, signs, communication system believe… |
| 4. About the complexity and construction conditions |
The construction site is narrow, the factory has a high beam with a crane beam system, the progress is fast, so in the construction process, it is combined with the construction of many items at the same time and working in three continuous shifts. The underground tank system is too deep to avoid affecting neighboring works, so Lass4 piles must be used. |