| 1. Type project | Medical buildings grade I, fire resistance grade II |
| 2. Terms of value | 9.620.409.000 VNĐ |
| 3. About the scale of implementation | Installation of electricity and lighting – Water supply and drainage for a 15-storey building; |
| 4. About the complexity and construction conditions | Construction in difficult conditions in terms of ground because within the scope of the school’s operation and work, the technical solutions of the design documents are appropriate, and the construction methods are reasonable. |
| 5. Other characteristics | According to common usage. |